Bathroom plumbing in Šiauliai
Installing baths, showers, wall-hung toilets, washbasins and taps.

Before the tiling we run the pipes and fit the concealed frame for the toilet and the shower drain. That way the tiler can work without obstacles.
When the finishing is done we install the bath or shower, toilet, washbasin, taps and towel rail, turn the water on and check that everything is watertight.
What we do
- Baths and shower enclosures
- Walk-in shower with a drain
- Wall-hung toilet with a concealed frame
- Washbasin with a vanity unit
- Taps, including thermostatic ones
- Heated towel rail
Two stages when renovating a bathroom
First stage, before the tiles: the pipes, the drain and the frames are prepared. Second stage, after the tiles: the fixtures are installed. Nothing has to be redone and the pipes stay hidden.
Frequently asked questions
Do you build showers with a drain and no enclosure?
Yes. Usually with a linear drain, because that kind of shower area is easy to clean.
Will you install fixtures I bought myself?
Yes. If you have not bought them yet, we will advise what to choose.
Do you take single jobs?
Yes, for example connecting a toilet, washbasin, tap or shower.
How long does the work take?
Preparation before the tiling usually takes a day, and installing the fixtures after the finishing takes about a day too.
We work in Šiauliai, Kuršėnai, Ginkūnai, Kairiai, Meškuičiai, Kužiai, Gruzdžiai, Bubiai and other places in Šiauliai district. Map and distances.
Need a plumber?
Call us, we will discuss the work and agree a time to visit. Mon–Fri 8–17, Sat 9–13.